Due to popular demand, TechTalk is now available online.  View presentations from industry experts on the latest NCC requirements for non-structural steel wall and ceiling systems. Simply register and gain access to multiple presentations addressing; 

- Wind Loading Standard 

- Post-Installed Anchors in Concrete Standard

- Compliance for Fire and Acoustics 

- Building Movement

 

 

                                                                                                                                                                                                                         

REGISTER

Presentations

Dane G Tech Talk

Dane Griffin

General Manager Engineering Design Services

  • When was NCC 2022 Implemented?

  • Which NCC is relevant for my project?

    Wind Changes: 

  • Impact on Internal Design Pressure

  • Is my Spec Compliant 

    Anchor Changes: 

  • Introduction of Seismic 

  • Pre-qualification

Daniel-Lim-2

Daniel Lim

Senior Development Engineer 

    • NCC 2022 Grandfather Clause

    • AS1530.1

    • AS1530.4

    • NCC Compliance

    • Evidence of Suitability 

    • FRL 

    • How systems get tested?

    • What should you look for?

       

Aiden Brisbane 2

Aidan Brisbane 

Technical Manager

Acoustics 

    • NCC requirements for Acoustics

    • Transmission v's Absorption 

    • CAC v's RW

    • Acoustic Flanking Paths 

    • Effects of Steel Framing Design on Wall Acoustic Performance

      Fire

    • NCC Requirements for Fire

    • Combustibility Requirements 

    • Fire Hazard Properties * Group Numbers 

    • Testing for FRL

    • Evidence of Suitability 

    • Effects of Steel Framing Design on Wall Fire Performance  

PP Tech Talk

Peter Pirozek

Senior Acoustician

    • Introduction to Acoustics 

    • Sound Insulation vs Sound Absorption

    • NCC 2022 Acoustic Requirements

    • Non-NCC Acoustic Requirements 

    • Affect of Steel Stud Framing Design on Acoustic Performance

    • Acoustic Flanking Paths 

Viktor Z Tech Talk 3

Viktor Zlovic

Engineering Design Services Manager 

  • NCC 2022 Allowances for Structural and Non-Structural Elements

  • Complying with NCC Allowances 

  • Rondo Testing Program on Movement-Induced Noice 

  • Case Study - In-Field Apartment Rebuild to Mitigate Movement Induced Noise 

  • Rondo's Solution for Building Movement

 

 

**We've invested so much pride and resources into producing this information for you, we kindly ask that you help us protect the quality and exclusivity of these videos by not copying, or reproducing any of our content or information for commercial purposes without our written agreement, as per the copyright laws which apply.**